About ATG
We design the control system,and we install it ourselves.
ATG Plant Automation is a control, safety and electrical systems integrator. We take a scope from process basis to sustained operation under one contract — engineering, field construction, commissioning and support.
Engineering that reaches the field.
Who we are
Since 2006,in and out of the Kingdom.
The Saudi entity, ATG Plant Automation Co. Ltd., is registered in Al-Khobar and holds a Ministry of Investment licence. It is supported by the group's engineering office in Lahore, Pakistan, by ATG Australia, and by regional offices in the Kurdistan Region of Iraq, the United States, Nigeria and Angola.
The business started in 2006 as AllTech Global and was rebranded ATG Plant Automation in 2009. Since then our engineers have commissioned plant-wide control and safety systems on gas-to-liquids, NGL, offshore, desalination and power assets across more than fifteen countries.
On projects ATG acts as System Integrator — and, unusually for an integrator, self-performs the electrical and instrumentation field work that the control system depends on. One accountable party from the philosophy document to the last gland.
Leadership
Led fromthe field.
ATG is run by a practising control-systems engineer, not a career administrator. That shapes what the company takes on and how it is delivered.
- PrincipalSayyed Muhammad Moazzam — control systems and functional safety; technical authority on PLC, DCS, SIS, ESD, F&G and SCADA.
- Experience20+ years in oil and gas automation, on and offshore — Project Director, Chief Solution Architect, Senior Engineering & Commissioning Manager, Lead Control Systems Engineer.
- Career trackChevron CABGOC Angola → Yokogawa Europe and ATG (GASCO Ruwais 3rd NGL; Chevron Tombua-Landana TLP) → Chevron Nigeria Escravos GTL 2011–19, plant-wide sole SIS engineer on a 27-controller ProSafe-RS system → Tengizchevroil Future Growth Project MAC interface and MOC engineer → ATG Saudi Arabia from 2022.
- StandardsFormally trained on IEC 61508 and 61511, ISA-84, 88, 101, 12, 18, 95, 5.x and IEC 62443; MSc Computer Engineering, BSc Computer Science.
- The wider teamSenior control system and design engineers, E&I supervisors, functional safety practitioners, commissioning specialists and craft crews. CVs for the assigned team are issued with every proposal.
Why it matters commercially: technical arguments are settled on engineering grounds, quickly, at the top of the organisation.
Group structure
Seven countries,one company.
The Saudi entity contracts in the Kingdom. Engineering, commissioning and field teams are drawn from the whole group.
ATG Plant Automation Co. Ltd.
6948 Muhib Al Din Al Sadi, 3945
Al-Khobar 34226, Eastern Province
CR 2051255287 · VAT 312184137300003
ATG Plant Automation (Pvt.) Ltd.
92-D Block, Model Town
Lahore 54700, Punjab
CR 2813
Building No. 8739, Kalakchi Main Road
Shaikhan, Kurdistan Region
How we run a contract
Commercial protection,both ways.
Clear terms make delivery easier for both sides. These are standard on every ATG package.
- Project execution plan and organisation chart issued before mobilisation
- Inspection and test plan agreed with the client; hold and witness points respected
- Progressive documentation — turnover packs built during the work, not after it
- Punch register with named owners and clearance evidence
- Documented management of change after handover
- Programme durations quoted with a written extension-of-time provision, so schedule risk is allocated explicitly
- Open, password-free source code and verified backups handed to the client
- Standard commercial framework in every proposal — limitation of liability, exclusion of consequential loss, LD cap, warranty, IP and licence, force majeure, governing law and dispute resolution
Quality, safety and certification
Certified and registered— and insured under your project.
ISO 9001:2015
Certified quality management system with a documented QA/QC policy, inspection and test plans, and hold-point discipline on every package.
ISO 45001:2018
Certified occupational health and safety management with a written HSE policy applied to all site activity.
CSIA
Registered with the Control System Integrators Association; ISA and IEEE affiliations.
MISA licence
Saudi contracting entity with commercial registration, VAT registration and a Ministry of Investment licence.
Start a conversation
Tell us whatyou need built.
Send the scope, the P&IDs or just the problem. A control-systems engineer — not a sales desk — replies from Al-Khobar, normally within one working day.
Al-Khobar head office
+966 59 350 1825 · +966 53 849 2308Proposals sales@atgpa.com
General inquiries@atgpa.com
Technical support techsupport@atgpa.com